Sigma evaluates Milwaukee industrial buildings
milwaukee
Sigma was retained to evaluate building settlement and a deteriorated pre-cast concrete roof at an industrial complex. The industrial buildings were constructed from the 1940s to 1960s and had experienced up to three inches differential settlement. The facility pre-cast concrete roof was deteriorated due to moisture used in the industrial process.
Services provided by Sigma included:
Settlement Review
- Surveying of building settlement benchmarks
- Coordination of a geotechnical engineering review
- Coordination and participation in a structured review
- Develop scope of work for investigation of settlement effects on mechanical and electrical systems
Roof Review
- Coordination and participation in structural conditions
- Develop cost estimate to review and replace pre-cast concrete